Los Altos ADU Builder: Design, Permits and Construction

Type Five designs, permits and builds custom ADUs in Los Altos, with one team from the first site visit to move-in. Los Altos approves ADUs with a building permit alone and allows detached units up to 1,200 square feet, so on most lots the real limits are setbacks, height, trees and budget.

Type Five backyard ADU with landscaping, built on site with wood framing

Building an ADU in Los Altos

Los Altos is one of the more straightforward places on the Peninsula to get an ADU approved. The city reviews ADUs and JADUs ministerially: you need a building permit and any related permits, but no planning permit, public notice or hearing.

That doesn't make every lot simple. What usually sets the schedule and the budget is the stuff you can't see from the street: a protected tree near the best building spot, the run to your sewer lateral, or an electrical panel that can't carry a second home. The city allocates one sewer lateral per parcel whether or not you add an ADU, so your new unit ties into the line you already have.

Type Five is a design-build firm based in Berkeley, with architects and a general contractor under one roof. We design every ADU with our site-built modular system and build it on your lot with conventional wood framing. You get set layouts and pricing you can plan around, and a home fitted to your site rather than dropped onto it.

As seen in the New York Times.

Los Altos ADU rules at a glance

Rule

Detached ADU

Attached ADU

JADU

Maximum size

1,200 sq ft

1,200 sq ft, and no more than 50% of the main house

500 sq ft, inside the house

Maximum height

18 ft

16 ft, or the zoning district height if greater

N/A

Side and rear setbacks

4 ft

4 ft

N/A

Front setback

Per zoning district

Per zoning district

N/A

Separation from other buildings

5 ft

5 ft

5 ft

Parking

Required, with exceptions

Required, with exceptions

None

Owner occupancy

Not required

Not required

Owner must live on the lot

Source: City of Los Altos ADU Information Guide. The Los Altos Zoning Code controls if anything differs.

Three ways to permit an ADU in Los Altos

The city gives homeowners three routes, and it helps to know which one you're on before anyone draws a line.

  • Custom plans. A designer draws an attached or detached ADU for your specific lot and submits it for a building permit. This is how Type Five works.
  • Pre-approved plans. Private designers submit standard detached ADU plans that the Planning and Building Divisions review ahead of time. You buy the plans and add your site details.
  • City permit-ready plans. Los Altos offers free detached ADU plans in three sizes (525, 854 and 1,190 sq ft) and three styles. You can pick from set options, but the city doesn't allow modifications.

Standard plans can save design time on a flat, open lot. If your best building spot sits near a protected tree, your lot slopes, or you want the ADU to work with the main house, a custom design is usually the better fit. Either way, the site work, utilities and construction still have to be planned for your property.

Detail of a Type Five ADU exterior with landscaping
Exterior of a one-bedroom Type Five ADU in Berkeley

How long a Los Altos ADU takes

Think of it as three phases: design, permitting and construction. State law gives cities 60 days to approve or deny a complete ADU application, but each round of corrections adds time.

Across 15 Type Five projects first submitted between June 2025 and May 2026 that now have a building permit, the median time from first submittal to issued permit was 120 days. The fastest took 50 days and the slowest 196. Projects still in review aren't in that number, so treat it as a best-case benchmark, not a promise. Our permit speed guide compares Bay Area cities using public data.

Construction comes after the permit. You can see how we sequence a build on our build schedule page.

What sets Type Five apart?

Most Los Altos homeowners talk to an architect, a few contractors and maybe a factory-built option before they decide. Here is what working with us looks like.

  • One team. Design, engineering, permits and construction stay with Type Five, so nobody points fingers when something changes.
  • A fixed budget before you build. We look at your actual site and give you a guaranteed budget for the whole project before construction starts.
  • Built on site, built to last. Every ADU is wood-framed in your backyard. No crane day, no factory box, and no guessing whether a module will fit down your driveway.
  • Design you can configure. Our software lets you try layouts and finishes online before we refine the plans with you.

Tell us about your Los Altos ADU

Every lot is different. Tell us about your property and what you want the ADU to do, whether that's housing a parent, a rental or a place for adult kids, and we'll walk you through what it would take.

Schedule a consultation

How our process works

One team takes your project from first sketch to move-in, with a fixed budget before construction starts.

Designing an ADU
01
Design
With Type Five’s online configurator, you can customize your ADU’s size, shape, and amenities from the comfort of your home. This innovative design tool streamlines initial planning, allowing you to visualize your project and make informed decisions. Once your design is finalized, we translate it into detailed plans and a guaranteed project cost that align with your property’s potential and your financial goals.
Permitting an ADU
02
Permit
Navigating the permitting process can be one of the most challenging aspects of ADU building. Type Five's software instantly generates permit sets with unparalleled accuracy, enabling us to expedite approvals through local East Bay city offices. This efficiency minimizes delays and sets your project up for a smooth transition into the construction phase, ensuring compliance with all permitting requirements.
Building an ADU
03
Build
As your general contractor, Type Five manages the entire ADU construction process. We coordinate a vetted network of skilled contractors who specialize in ADU construction, ensuring high quality craftsmanship at every stage. We source dependable and renewable materials to support sustainable building practices. From foundation to finish, our team will keep you informed about costs and timelines, so you can confidently move forward without unexpected surprises.
Living in an ADU
04
Live
Our accessory dwelling units are engineered for durability and long-term comfort. After construction, we continue to support you with maintenance and improvements, helping your backyard home adapt as your needs evolve. Whether you use your ADU as a short term rental, a family guest house, or a home office, we are committed to helping you enjoy your added space for years to come.

FAQs about building an ADU in Los Altos

Short answers to the questions Los Altos homeowners ask us most.

Do I need a planning permit for an ADU in Los Altos?

No. Los Altos reviews ADUs and JADUs ministerially, so only a building permit and related permits are required. There's no planning permit, public notice or hearing.

How big can an ADU be in Los Altos?

A detached ADU can be up to 1,200 square feet. An attached ADU can also reach 1,200 square feet but can't exceed 50% of the main house. A JADU, built inside the existing home, tops out at 500 square feet.

How tall can a detached ADU be in Los Altos?

The city's ADU Information Guide lists 18 feet for a detached ADU, with 4-foot side and rear setbacks and 5 feet of separation from other buildings.

Can I use the city's free permit-ready ADU plans?

Yes, if your lot is eligible. Los Altos offers free permit-ready detached plans at 525, 854 and 1,190 square feet in three styles, but they can't be modified. Type Five designs custom ADUs, which makes sense when your lot, trees or goals don't match a standard footprint.

Do I pay impact fees on a Los Altos ADU?

Not on an ADU of 750 square feet or less, which is exempt from impact fees. Larger units may be charged local impact fees. School, permit and utility fees are separate. Our Bay Area ADU cost guide breaks down the full budget.

Does an ADU need its own sewer connection in Los Altos?

Usually not. The city's current policy allocates one sewer lateral per parcel, regardless of whether it has an ADU. You may still need to upsize utilities for the added load.

How long does it take to permit an ADU?

Across 15 Type Five projects first submitted between June 2025 and May 2026 that now have a building permit, the median time from first submittal to issued permit was 120 days. The fastest took 50 days and the slowest 196. State law gives cities 60 days to act on a complete application.

Are you a prefab ADU company?

No. Type Five is a design-build firm, and we build every ADU on site with conventional wood framing. Our site-built modular design system gives you some of what people like about prefab, like set layouts and clear pricing, while the home itself is built from the ground up to fit your lot.

Schedule a free consultation to discuss your project, and learn more about our process, pricing, and approach.

We're building the next generation of American homes.
Designed in Berkeley, California.
CSLB #B-1086540
© 2026 Type Five
TermsPrivacy