Frequently asked questions.
Here's what most people want to know about our process and services.
Looking for something specific? Don't hesitate to reach out to us with any questions, ideas, or feedback.
General
An ADU is a secondary home on your property with its own kitchen, bathroom and sleeping area, so it can function independently from the main house. Type Five builds new ADUs rather than converting existing structures.
Explore and consult: browse layouts and book a free call.
Site visit: a free onsite assessment of your property.
Proposal and design agreement: you get a starting design and budget, then sign a design agreement.
Design: we finalize your layout and finishes, usually over about 2–3 months.
Permitting: we submit to the city and respond to comments. Review takes about 1–5 months depending on the city.
Construction contract: a fixed price is locked in after permits.
Construction: about 6–7 months on site.
Move-in and warranty: final inspection, walkthrough and a 1-year workmanship warranty.
Most Type Five ADUs cost about $550–700 per sq ft all-in, including the build, foundation, trenching, windows, HVAC, appliances, roofing and flooring. Larger units cost less per square foot.
The onsite assessment is free. You then get a proposal with a starting design and budget and sign a design agreement; the construction contract comes later, after permits.
Common options include a cash-out refinance, HELOC, home equity loan, construction loan or personal financing. We can connect you with lenders experienced in ADUs.
Type Five builds new ADUs and doesn't convert existing garages. In most places, a new ADU can go in an existing garage footprint to keep its setbacks, as long as the height doesn't change.
Yes. To count as an ADU, it needs its own kitchen and bathroom, though a minimal kitchen (a 2-burner cooktop and sink) qualifies.
Neither. Type Five is a design-build firm that builds every ADU on site, with no cranes or oversized loads. That gives you full design freedom while still using prefab-style efficiencies.
A permitted ADU generally raises resale value by adding living space and possible rental income. Many owners recover most or all of their investment.
'Type V' is the building-code term for wood-frame construction, the method used in most U.S. homes. Our name reflects that we build sturdy, ground-up homes on site, not container or modular boxes.
In California, yes: state law allows ADUs on residential lots as long as they meet state and local standards. Outside California, local rules apply, and HOAs can add design review, so we confirm what applies to your property.
In California, a single-family lot can have at least one ADU plus a Junior ADU inside the main house, and multifamily lots can often add two detached ADUs. Local rules and HOAs can add requirements, so we confirm what fits your property.
With Type Five you have one contract and one point of contact from design through construction, so pricing is guaranteed and we're accountable for the result and the warranty. Hiring an architect and a builder separately is usually slower and costlier, and leaves you coordinating between them.
No separate architect is needed. Our in-house designers work with you on the layout and finishes and prepare renderings, floor plans and the permit drawings. Structural engineering is quoted separately once your layout is approved.
Yes. We build all-electric, solar-ready homes that exceed California's Title 24 energy standards, use sustainable finishes where we can and order precisely to minimize waste.
Every ADU is designed for your property, with a wide range of layout and finish options. Our software-driven process keeps design and construction fast and precise, and we build all-electric homes with high-grade materials.
Site Feasibility
As a rule of thumb, we keep the ADU at least 3 times the tree's diameter away from its trunk. If space is tight, the city will expect a survey and an arborist's recommendation, and we'll arrange both. You'll just need to help us coordinate the arborist's site visit.
Tree removal rules vary by city. If the arborist's report lists a value for a tree, that's an appraisal of the tree, not a fee you pay.
Many cities require a survey for an ADU permit to confirm property lines and setbacks. A setback survey is included in our design fee, and we'll tell you upfront if your city or lot needs a fuller boundary or topographic survey. If there are trees near the ADU, the survey will locate them, and the city may also expect an arborist's report, which we'll arrange.
Surveys usually take about a month. If you already have one, send it to us. There's no set expiration date, but it needs to reflect your property as it is today, so we'll check whether it's still usable or needs an update.
A geotechnical report is required if your lot is in a mapped landslide, fault or liquefaction zone, and otherwise it's up to the city or county. It sets the foundation type, takes about 1–2 months and runs alongside design.
Structural engineering is quoted separately once your layout is approved (about $3–5K when a geotech is involved), and we send it as an estimate for you to approve. Civil engineering is extra when the city requires it, though we try to resolve grading comments in-house first.
Design
Yes. Every Type Five ADU is made to order, so during design you can move walls, resize rooms or add windows and built-ins within code. We show the cost of each change before anything is submitted for permit.
Under California law, detached ADUs need setbacks of 4 ft from the side and rear property lines (sometimes 5 ft in fire zones). Front setbacks follow local zoning. Some exterior equipment, like water heater and battery closets or HVAC condensers, can't go inside the setback, so we'll design and place your ADU with room for them.
Yes. We can add zero-step entries, wider doors, a curbless roll-in shower, grab bars and ADA-height fixtures. Cost depends on the features you choose.
Ceilings are 9 ft regardless of roof type. Upstairs ceilings are flat as standard, and a vaulted ceiling needs extra engineering.
We strongly discourage owner-supplied appliances, fixtures and materials, and each substitution has a coordination fee. If you'd like to use a special or owner-supplied product, your design team will need to review it first to make sure our construction team can accommodate it.
We can design a gable, shed or flat roof, with shingles or standing-seam metal in a range of colors. "Flat" roofs have a 1/8" slope toward drains and include an overflow. The roof shape can change during design, as long as height limits allow.
Hardie siding and stucco cost about the same and perform about the same in a fire; metal and real wood cost more. Hardie is easy to patch and paint and resists rot, while stucco can match your main house.
Every ADU includes a fridge, induction cooktop and sink. We use Summit (standard), Bosch and Fisher & Paykel, and panel-ready options are available.
Wide-plank engineered hardwood is standard, and Marmoleum, cork, luxury vinyl plank and polished concrete are options. We'll walk you through the cost, durability and refinishing tradeoffs of each.
Yes. Seismic and wind loads are handled by plywood shear walls, hold-downs and anchor bolts, designed by a structural engineer to meet California code.
Utilities and solar
Many ADUs need a panel upgrade (200A is typical, 400A optional), and it can start once the permit is submitted. The power switchover usually takes a single day and rarely delays the schedule; tell us about large loads like a sauna or hot tub so we can size it right.
Most ADUs connect through the main house with a subpanel. A separate PG&E meter adds significant cost and time. Utilities share one trench.
Solar is required above a size that depends on your city, and you can use your own installer. Panels can go on the main house where allowed, and adding solar usually moves you to the newer NEM rate.
We'll recommend the system that fits your ADU and climate zone. In some areas, a ducted system only meets California's Title 24 energy code if the attic is sealed and insulated, which adds cost.
Permitting
Design and permitting are two separate phases. Design takes about 2–3 months (longer if a geotech report is needed) and includes the structural engineering and any other consultant work required for the permit submittal.
Permitting starts when we submit to the city, and how long it takes depends on the city or county: anywhere from 1–5 months. ADU permits are ministerial, so neighbors can't block one. City review is outside Type Five's control, but we respond to comments promptly.
Type Five handles planning approval, the building permit, fire department sign-off, utility coordination and other agency reviews, and you sign an authorization form so we can act for you.
You'll also need to sign a deed restriction with all legal owners in front of a notary (we can send one to you), provide proof of ownership if the city asks for it, and pay final permit fees and sign a few last forms before the permit is issued. We'll file the paperwork for the ADU's new address, which costs about $250 in some cities, and you'll install a mailbox.
Yes. Your city assigns the ADU its own address; we prepare the address form for you to sign, and some cities send a confirmation letter.
Yes, but even small changes like moving a window need engineering and drawing revisions, extra fees and a city revision review that can take weeks. We usually finish the issued permit first and handle changes as a revision.
Yes, sometimes. Cities and fire departments can add conditions, such as proving fire-truck access or installing a sewer backwater valve, and we price these separately.
In California, state law allows ADUs at least 16 ft tall, and many cities allow 20–25 ft, which is about the minimum for a livable two-story. Limits vary by city and zone (Berkeley's hillside areas cap it at 20 ft), and we check yours early in design.
Sprinklers are required when the fire hose distance from the curb to the farthest point of the ADU is over 150 ft, though the fire marshal sometimes grants an exception. They're the main cost that may not be in your initial budget.
In California, an HOA can't block an ADU, but it can require reasonable design review, which can affect your design and timeline. If your HOA has a review process, you submit it and we provide the drawings, so tell us early if you're in an HOA.
Often not. In California, cities can't require ADU parking within ½ mile of transit or under other exemptions, and even when required it's limited to one space, which can be tandem or in a setback.
In California, no. ADU permits are ministerial, so if the design meets the rules the city must approve it and neighbors can't veto it, though an HOA may still review the design.
Pricing and Payments
The final price is rarely more than 5–10% off the initial estimate, and we lock a fixed price after permits that only changes if you change the scope. Complicated sites, like hillsides or narrow-road access, take longer to price because the foundation, utility and excavation work need more detail.
To keep your permit moving, Type Five pays the city's fees and invoices you for them at the end of permitting. Once the city approves the permit, there are a few final fees (such as school impact and public works fees) that must be paid before the permit is issued.
During design, we identify possible extras, like utility upgrades or hillside foundations, and include them in your guaranteed price. True surprises are rare, and we take responsibility for anything we miss. The most common item that may not be in the initial budget is fire sprinklers.
The base contract doesn't include main-house utilities, landscaping, sewer lateral work from your house to the street, or decking and pavers for roof decks. Window screens are paid from the allowance set aside in your contract for extras and changes. City requirements, such as a backwater valve, are scoped and priced separately.
Only the design and permitting fee is due upfront. Construction is paid by milestone as work progresses (typically 15% at each major stage, with the last 10% at final inspection), which funds material and labor deposits.
In California, your main house keeps its current Prop 13 assessment, and the assessor adds the ADU's value separately, usually about 1% of its construction cost per year. This is called a blended assessment.
Construction
Construction starts a few weeks after the contract is signed and usually takes about 6–7 months, including about a month for site work and the foundation. Larger or two-story units and heavy earthwork add time, and most projects take about 10–12 months from the first design meeting to move-in.
The first 2 months (site work, foundation, framing) are the noisiest. Crews work city-allowed hours with no noise before 8am, and we can add privacy fencing.
Grading, retaining walls and drainage for the ADU are included in our scope, but landscape design and planting are not. We can remove existing patios or driveways and add decks or hardscape that relate to the ADU. Any of these extras will be included in your construction contract, which we'll send after the permit is issued.
Yes, construction has its own fixed-price contract after permits, and we can send the template early. It includes a 1-year workmanship warranty, a 10-year structural warranty and manufacturer warranties.
Yes, you can arrange demolition yourself and receive a credit, or we can handle it after a site visit with our demo subcontractor. Type Five removes any remaining slab as part of site work, and some cities, like Berkeley, require a demolition permit and lead testing.
Yes, Type Five builds year-round. Some areas, like Marin County, have a winter grading moratorium, so heavy earthwork there waits for spring.